Laserfiche WebLink
Onsite Permit 555-23-006940-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555088923369 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> ,...-,�¢�. + z � �-�� :-: +�'' r� . 'y�v, °� z'�� � .�'a ^�+.�. � . •y 't�.k'�'-a`"�i,,-�'^$�v= � '��a° _ <br /> Rate[s ic! 2/16/24 4 _ s e it f iratlon da 211 /25 <br /> v to'� °.. % "aTF SA �"�s 3s � � �^ �.� tea. � a Yc�a°�`�.. �� v � ` , a 3 <br /> Wor 1d IAt 9,XkR j1�AJ F2EP 3 l S ,K, SFt3 T 9 <br /> g- s.� , +. `�;. q3,c p�:fu �' a' E m. ,„s T °* s';c � ��" �� '.P. :�.a �3`�.,°. a <br /> Conditions of approval <br /> •Filter fabric required over drain media(rapidly permeable soils). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system.The maintenance <br /> provider must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than <br /> 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel.Pump wiring <br /> must comply with applicable building, electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 2/15/24:2:13:47PM ONS_OnsitePermitpr <br />