Septic Permit 555-23-006940-PRMT Page 2 of 3
<br /> Date-C:ertkrc"ate 646V raikaN a 1 l � E .r� 4,4
<br /> wootmescri tion - RE MAJ�REP4 BDRM SFD.;TQkREPL 3 BDRiVt SFD(Npww,i AND Df
<br /> g € Via,,.., pA x ,, ,
<br /> �`" h,4'� � ;�` r fit ;r .�a 's�"r"sar.l„£ '�3 .'2, a r a �.,� a
<br /> a
<br /> Corrdiilorts ofA ovat � w���,r 1i r � - .,� .:... .,, �k` �,- ra,s""r� ,k�«_.. ..�=.,w,>.,,. . b,,:k �;�tee ro� .,,:. ., ,.,. ,�.,., ., ,._
<br /> •Filter fabric required over drain media (rapidly permeable soils).
<br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance
<br /> provider to inspect, adjust and maintain the onsite system.The maintenance provider must submit an
<br /> annual report and annual evaluation fee.
<br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent).
<br /> •The system must be installed by the property owner or a licensed sewage disposal business (installer).
<br /> •Vehicular traffic and livestock must be restricted from the system area.
<br /> •AII roof drains must be directed away from the system
<br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch
<br /> minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater than 36-in deep. Maintain access
<br /> to septic tank for pumping and service.
<br /> •Meet all required setbacks
<br /> •The system must be installed in the area approved during the site evaluation and in accordance with the
<br /> construction plan approved by the agent, including any changes made by the agent.
<br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications
<br /> without approval by the agent.
<br /> •For product approval information and manufacturer installation requirements see DEQ website at:
<br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx
<br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply
<br /> with applicable building,electrical, or other codes.An electrical permit and inspection from the Department
<br /> of Consumer and Business Services, Building Codes Division, or the municipality with jurisdiction, is
<br /> required for pump wiring installation.
<br /> •Install the pump and system components in accordance with the approved pump curve and specifications.
<br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the
<br /> effluent sewer or pressure transport pipe from tank to drainfield.
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect
<br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance
<br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or
<br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment
<br /> of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the
<br /> issuance of this Certificate of Satisfactory Completion.
<br /> ,W` ae srs r'* # rzfl y o.� a.� 'Y.,a c - �, .s3sv rc a y q ay �, o '�i' .. ,
<br /> ��t CertCficate of�Satisfactoty4CompietFan K �F
<br /> � >a„n.o �. '
<br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No
<br /> Comments: COSC Issued
<br /> A .,.,." -. ._ .. CompCe�ed InspeCttOrIS ,�: gr_, .. z � .. s ,.
<br /> 7/25/24: 1:04:47PM ONS_OnsiteCSC pr
<br />
|