Laserfiche WebLink
Start-Up Checklist/AdvanTex® Systems <br /> AX2OPUStart-Up Checklist ForO g n Service Providers <br /> Secondary lte:OIMent system Timer Settings: <br /> ° ownme,,, <br /> Recirculating Splitter Valvp Assembly Verify the following: <br /> 1111 Verify proper stinger length,Stinger length — , — <br /> AdvanTex System(AX2ON).Verify the following: <br /> Pi All pods installed level. tZ Proper wire size used based on information provided by <br /> manufacturer. <br /> All piping properly covered and compacted. <br /> Ventiration System.Verify the following: Conduit seal Installed. <br /> X ty]Ventilation intake(s)properly located and installed. All electrical connections in panel are secure. <br /> AdvanTex Biter Operation.Take residual head measurement: DI Panel wired per manufacturer's wiring diagram. • <br /> Pod#1:, -1144 Control panel start-up procedures,as detailed in the AdvanTex <br /> Pod#2: Installation Guide,have been followed. <br /> Secondary Treatment Notes: , j Appropriate cliOgRawleftin panel for future review. <br /> Controls Notes. ItAte,4v,a. AA,- 4004013. 4/1 Discharge Pump Basin/Tank.Verify the following: <br /> Final/Safety Inspection <br /> Basin Model/Tank size(s): <br /> El Visually inspect basin/tanks for infiltration. Verify the following: <br /> Check that the basin/tank is set level. ,F6 Lid is secured on all splice boxes. <br /> Discharge Basin/Tank Pumping Equipment Verify the following: Na All access riser hardware is in place.Lids are secured. <br /> Pumping equipment Installed properly. IR Control panel documentation is left at site;panel Is set <br /> for automatic operation and secured. <br /> K.Pump and discharge plumbing are compatible <br /> (e.g.pressure rating). Final Notes:, — <br /> Pump model installed: <br /> ix Discharge plumbing properly installed through watertight <br /> grommet,and bail valve is in open position. <br /> tlFloats operate properly. <br /> NI Floats set proper* Homeowner's Package <br /> El,'Splice box mounted In access riser Watertight connectors <br /> Used. licimeowner's Package(and manual)has been reviewed <br /> Discharge Basin/Tank Pumping System.Verify proper operation of the with homeowner by....(check one) <br /> discharge basin/tank pumps. Installer <br /> pPumps operate In Manual [11 Service Provider <br /> ,RPumps operate In Automatic Dealer <br /> Controls Other Notes:, <br /> "4. NOTE Refer to the control panel instructions for detailed operational <br /> features of the control panel Itself. <br /> Control Panel model installed MP, <br /> SCL-ATX-OM-OR-1 @ 2003 Oranco Systems*Inc. <br /> Rev.3.1,CD 11/D5 <br /> Riga 2 of2 <br />