My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12285569
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12285569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 10:54:50 AM
Creation date
7/25/2024 5:01:45 PM
Metadata
Fields
Template:
Permits
Permit Address
3095 MOLALLA RD NE
Permit City
Woodburn
Permit Number
555-23-006843-PRMT
Parcel Number
051W10B 01300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Start-Up Checklist/AdvanTex® Systems <br /> AX2OPUStart-Up Checklist ForO g n Service Providers <br /> Secondary lte:OIMent system Timer Settings: <br /> ° ownme,,, <br /> Recirculating Splitter Valvp Assembly Verify the following: <br /> 1111 Verify proper stinger length,Stinger length — , — <br /> AdvanTex System(AX2ON).Verify the following: <br /> Pi All pods installed level. tZ Proper wire size used based on information provided by <br /> manufacturer. <br /> All piping properly covered and compacted. <br /> Ventiration System.Verify the following: Conduit seal Installed. <br /> X ty]Ventilation intake(s)properly located and installed. All electrical connections in panel are secure. <br /> AdvanTex Biter Operation.Take residual head measurement: DI Panel wired per manufacturer's wiring diagram. • <br /> Pod#1:, -1144 Control panel start-up procedures,as detailed in the AdvanTex <br /> Pod#2: Installation Guide,have been followed. <br /> Secondary Treatment Notes: , j Appropriate cliOgRawleftin panel for future review. <br /> Controls Notes. ItAte,4v,a. AA,- 4004013. 4/1 Discharge Pump Basin/Tank.Verify the following: <br /> Final/Safety Inspection <br /> Basin Model/Tank size(s): <br /> El Visually inspect basin/tanks for infiltration. Verify the following: <br /> Check that the basin/tank is set level. ,F6 Lid is secured on all splice boxes. <br /> Discharge Basin/Tank Pumping Equipment Verify the following: Na All access riser hardware is in place.Lids are secured. <br /> Pumping equipment Installed properly. IR Control panel documentation is left at site;panel Is set <br /> for automatic operation and secured. <br /> K.Pump and discharge plumbing are compatible <br /> (e.g.pressure rating). Final Notes:, — <br /> Pump model installed: <br /> ix Discharge plumbing properly installed through watertight <br /> grommet,and bail valve is in open position. <br /> tlFloats operate properly. <br /> NI Floats set proper* Homeowner's Package <br /> El,'Splice box mounted In access riser Watertight connectors <br /> Used. licimeowner's Package(and manual)has been reviewed <br /> Discharge Basin/Tank Pumping System.Verify proper operation of the with homeowner by....(check one) <br /> discharge basin/tank pumps. Installer <br /> pPumps operate In Manual [11 Service Provider <br /> ,RPumps operate In Automatic Dealer <br /> Controls Other Notes:, <br /> "4. NOTE Refer to the control panel instructions for detailed operational <br /> features of the control panel Itself. <br /> Control Panel model installed MP, <br /> SCL-ATX-OM-OR-1 @ 2003 Oranco Systems*Inc. <br /> Rev.3.1,CD 11/D5 <br /> Riga 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.