My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12285569
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12285569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 10:54:50 AM
Creation date
7/25/2024 5:01:45 PM
Metadata
Fields
Template:
Permits
Permit Address
3095 MOLALLA RD NE
Permit City
Woodburn
Permit Number
555-23-006843-PRMT
Parcel Number
051W10B 01300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-23-006843-PRMT Page 2 of 3 <br /> I}at+e'eertffrtate, treed t 1rdTf1 " �8 'kr <br /> z ' H. <br /> Work Description ALIT BE�E� S@ 5 BDR* Q E} " , ri ;`� l; r,, 4, + � <br /> ra <br /> Coition Ap r a <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel.Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of Consumer <br /> and Business Services,Building Codes Division,or the municipality with jurisdiction,is required for pump wiring <br /> installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> •Equal distribution,all trench bottoms must be at the same elevation.Use Distribution box(es). <br /> •This permit is for the installation of an Alternative Treatment Technology(AU)system and is to be installed by a person certified <br /> by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative Treatment Technology rules at OAR <br /> 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the treatment system <br /> malfunctions. <br /> •The septic tank must be approved for use with the ATT system to be installed. <br /> •In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider is required to <br /> Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the manufacturer to <br /> inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual report and annual <br /> evaluation fee. <br /> 7/18/24:10:07:48AM ONS_OnsiteCSCpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.