Laserfiche WebLink
Onsite Permit 555-23-006843-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555082544455 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> 5 p« y �ti°%d3.e -; � WV , , _u i :. � J'.§'a `� -�+"A,� ,a:h�_' �C s `f '.a" »",,,`�,�';�`u '49; s . ' ., �, F <br /> Date issued�4117/24 1 3 „ � ` <� � Expirationirfater i 7/25 <br /> isxB. A k 1' Ie f jF S 'r 1� d y+f : J h a"ivh" ram,; b �' } .Jn' yY•$ry <br /> , .,.,k -` `� ti, <br /> WU cfescriphon MM ALT, g3 BDRM s o( 4. '3�Rf l> Rl�i ll qMa' : _ ; $ ;�� � „ <br /> �eF , a 4�$ r y wa� Y.J a 4. a W' s <br /> ��� .'� fi�.oe4,. .w a.�. ,f ..a, 5q .,uaux,��� e�E <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: Yes <br /> Not Applicable N/A <br /> Groundwater type: pp Groundwater depth: <br /> Other special rqmt: An electrical permit must be finaled prior to the issuance of a Certificate of Satisfactory Completion. <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building,electrical,or other codes.An electrical permit and inspection from <br /> the Department of Consumer and Business Services,Building Codes Division,or the municipality with <br /> jurisdiction,is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> -Equal distribution,all trench bottoms must be at the same elevation.Use Distribution box(es). <br /> -This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by <br /> a person certified by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative <br /> Treatment Technology rules at OAR 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the <br /> treatment system malfunctions. <br /> •The septic tank must be approved for use with the ATT system to be installed. <br /> •In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider <br /> is required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit <br /> an annual report and annual evaluation fee. <br /> 4/18/24:3:53:00PM ONS_OnsitePermitpr <br />