Laserfiche WebLink
Onsite Permit 555-23-008453-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555006407422 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued: 11/8/23: Expiration date:11/2/24 <br /> Work description:MAJ REP: 3,BDRU SFD <br /> • <br /> Special Requirements <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, <br /> Building Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps.Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> •Filter fabric required over drain media(rapidly permeable soils). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance provider <br /> to inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual report and <br /> annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent filter required at tank outlet. <br /> 11/3/23:8:26:09AM ONS_OnsitePermitjr <br />