Laserfiche WebLink
Septic Permit 555-23-008453-PRMT Page 2 of 3 <br /> Date��G°ertrf�ri�te�tssuect 07f1'8120 4�• � � � �� :�« � �� �� ti - <br /> ,y r «:�. �. r s � aim" 3� � r t# ,- <br /> inmER,Des tion t J I~F?d7313t� t SFl1 4,„ ., <br /> 5 w'„a 4t•tx- <br /> roorrdit cinsAW ipprova .. ., . ,�i <br /> •An electrical permit and inspection from the Department of Consumer and Business Services,Building Codes <br /> Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with acceptable threaded <br /> plugs or caps.Minimum head of 5-ft at remotest orifice,less than 10%variation. <br /> •Filter fabric required over drain media(rapidly permeable soils). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance provider to inspect,adjust <br /> and maintain the onsite system.The maintenance provider must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •Effluent filter required at tank outlet. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The aria of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> a <br /> 4 eli9.1 : 9,11. [sfa aryl m le r� , <br /> M,K ��,o-��: �, '�`'s3„ t „;�r ,v , .a �".' *''Y;.`��r:<:<..,..._ .,..� .wx�n ,+�. �.�1<.�;m.,.�. __ ....r. �,..,^z.. _..s �..�. .�. �. <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: A Certificate of Satisfactory„ Completion was issueds on 07/18/2024 and the system is authorized for connection. <br /> a :5 'y,fl .Q <br /> �a,,. . # ', a � a., �efea�inspeCttot5t� 4« u�� �� �' �,Ma� x - <br /> 7/18/24:8:14:47AM ONS_OnsiteCSC_pr <br />