My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12271038
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12271038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 11:37:58 AM
Creation date
7/18/2024 1:21:16 PM
Metadata
Fields
Template:
Permits
Permit Address
306 MONITOR RD
Permit City
Silverton
Permit Number
555-23-006413-PRMT
Parcel Number
061W26DD01800
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-23-006413-PRMT Page 2 of 3 <br /> date eirlitr-at ed,071:52#t24 - <br /> itlfo x tessccriptto REFS lsTALLtNG sA T N 11 p vrA t [N Ett= AL.B � <br /> •This repair permit is for replacing a tank located under a garage and extending the drainfield to account for a removed line that <br /> ran under the house. <br /> -Properly decommission the old septic tank and submit appropriate documentation. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. --- <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction, is required for pump wiring installation. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> •Equal distribution,all trench bottoms must be at the same elevation. Use Distribution box(es). <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2.Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> .. a„ .... ... ...._ . :..' 4eitifit,90a Sobs ± tar Ca pr etian .. . . <br /> System Inspection: No Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: Yes <br /> Comments: N/A <br /> 7 +3s_ <br /> 7/15/24:9:18:22AM ONS_OnsiteCSC.pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.