Laserfiche WebLink
Onsite Permit 555-20-009195-PRMT Page 3 of 4 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555070946210 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued:"2/4/21 Expiration date.2/4/22 <br /> Work descriptions'FIRE MAJ REP.,2 BDRM..PRIMARY.; <br /> Conditions of approval <br /> •Both the initial and replacement disposal areas are to be protected from traffic, livestock <br /> and farming activities, development or other potential disturbance of natural soil conditions <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes.An electrical permit and inspection <br /> from the Department of Consumer and Business Services, Building Codes Division, or the <br /> municipality with jurisdiction, is required for pump wiring installation. <br /> Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •The area must not be subjected to excessive saturation due to, but not limited to, artificial <br /> drainage of ground surfaces, roads, driveways and building down spouts. <br /> •This approval is given on the basis that the parcel described above will not be further partitioned <br /> or subdivided. <br /> -Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral <br /> piping with acceptable threaded plugs or caps (minimum head of 5-ft at remotest orifice, less than <br /> 10%variation). <br /> -Filter fabric required over drain media (site has rapidly draining soils). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system.The maintenance provider <br /> must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> •All tanks must be tested for water-tightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep (thirty-inch minimum diameter if greater <br /> than 36-in deep). <br /> -Maintain access to septic tank for pumping and service <br /> -The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> -For product approval information and manufacturer installation requirements see DEQ website <br /> at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Sewage ejector(grinder) pump: septic tank must be two-compartment with an effluent filter. <br /> ▪Effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 <br /> inches of fall from one end of the pipe to the other. In addition, there must be a minimum difference <br /> of 8 inches between the invert of the septic tank outlet and either the invert of the header to the <br /> distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to <br /> the distribution pipes of an equal distribution absorption field <br /> 2/4/21:2:38:47PM Page 3 of 4 ONS_OnsitePermitpr <br />