Laserfiche WebLink
Onsite Permit 555-24-003165-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555073149873 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> or Wctrkg escxtg�ttia n` r Cx , . Wag?, <br /> INtTgAD IEWTAN ANEWNE'FROM Fur; <br /> R� -3 Hi,:O{:¢ 'P Wy�v.a, jA rfiT,H„fide' <br /> �6 ,. <br /> A+ e t i <br /> i .X• <br /> to y: '' <br /> » ;; .....,.. .. M,,. , tt',s hyn,»t6.+D'id .�..a..». ,r ,. ,,vz..;?',.:,�,`,;,k ',k ,,'a ,' xr,`"^',. ,'4,�,; ;'we ..,.,s,.,N•'�'a;. �' r;,., '. :..., <br /> Conditions of approval <br /> -The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> -All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> • <br /> 4/26/24:11:35:56AM ONS_OnsitePermitpr <br />