My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12267034
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12267034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 9:14:35 AM
Creation date
7/16/2024 11:51:17 AM
Metadata
Fields
Template:
Permits
Permit Address
6725 SKYLINE RD S
Permit City
Salem
Permit Number
555-24-003165-PRMT
Parcel Number
083W19C 00400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-24-003165-PRMT Page 2 of 2 <br /> bate6Derttfrcate°1ss[teclMtl4 2 •d <br /> Worl t3escnption I ttl , LIW AD tJ 7sANK"ANC t_IIl I ROAtt°I^L1lURl SHOP 7 IT BA SRC CIM <br /> . F � <br /> �.iu..",a��� Va�.� $'" � <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty- <br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. <br /> Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply <br /> with applicable building,electrical, or other codes.An electrical permit and inspection from the Department <br /> of Consumer and Business Services, Building Codes Division, or the municipality with jurisdiction, is <br /> required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Gertifr �a Sa acto Co P1:0t,o,I <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> Inspector Inspection Inspection Date Inspection Result <br /> Matt Knudsen 7020 Pre-cover 07/05/2024 Approved <br /> Issued By: Matt Knudsen, Onsite Wastewater Specialist Effective Date: 07/08/2024 <br /> Malt Kew <br /> CALL BEFORE YOU DIG...I'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules.You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center Is 1-800-332-2344.) <br /> 7/8/24:8:49:59AM ONS_OnsiteCSC pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.