Laserfiche WebLink
Onsite Permit 555-23-004277-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555005623600 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 5/26123 �" y `yy k u xpiration date 5/25/24` <br /> Work descr►ption NEW INSTALL 4 BDRM SFD <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Conditions of approval <br /> •A final inspection request and notice (FIRN)form including a detailed and accurate as-built <br /> plan of the constructed system and a list of all materials used in the construction of the <br /> system must be completed and submitted prior to requesting a final inspection. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater than <br /> 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> 5/26/23:6:51:37AM ONS_OnsitePermitpr <br />