My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12267025
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12267025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 2:19:42 PM
Creation date
7/16/2024 11:51:01 AM
Metadata
Fields
Template:
Permits
Permit Address
320 JANICE CT
Permit City
Detroit
Permit Number
555-23-008353-PRMT
Parcel Number
105E02DA06300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-23-008353-PRMT Page 4 of 6 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555077470272 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Rafe issued 14112123 ' F ' ' e y,. , " ' . �'"KExpiration,date '10111/24 <br /> `- '� 4 �` ' 'R3,6�.f! x� p''' 4a, �;&� ,��, q{,. d :�i 'i' <br /> ,s :Y � � �y�, � �'���'��: :kh�g,..k� � r„l,a' u�e Fy '�w�` Ci ��� z ,p,yf�' <br /> Work description NEW(INSTALL I etDRM SFD a 4- <br /> .a v a lr � � �. �� 3+.r�' a i s 'sag" ' .rhu ,'. <br /> .o-.4a��` ��n. �,e<, �.„v., � <br /> Conditions of approval <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and <br /> is to be installed by a person certified by the system manufacturer in accordance with OAR <br /> 340-071-0600 and 0650. See Alternative Treatment Technology rules at OAR 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> •The ATT system must be designed to prevent untreated waste from passing into the <br /> absorption field if the treatment system malfunctions. <br /> •The septic tank must be approved for use with the ATT system to be installed. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT <br /> maintenance provider is required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider <br /> certified by the manufacturer to inspect,adjust and maintain the onsite system.The <br /> maintenance provider must submit an annual report and annual evaluation fee. <br /> •Gravelless absorption method rules at OAR 340-071-0290 (6). Pressurized distribution <br /> required w/distribution piping perforated with 1/8 inch diameter orifices on maximum 2-foot <br /> centers at the 12 o'clock position and at least a 2-foot residual head at the distal orifice. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep.Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building,electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Equal distribution,all trench bottoms must be at the same elevation.Use Distribution <br /> box(es). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system.The maintenance <br /> provider must submit an annual report and annual evaluation fee. <br /> -Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral <br /> 10/12/23:2:40:18PM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.