My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12267022
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12267022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 8:46:18 AM
Creation date
7/16/2024 11:50:58 AM
Metadata
Fields
Template:
Permits
Permit Address
18508 MT ANGEL SCOTTS MILLS RD NE
Permit City
Scotts mills
Permit Number
555-23-004352-PRMT-01
Parcel Number
061E16D 00700
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ONSITE SYSTEM MATERIAL LIST INSTRUCTION SHEET <br /> The Onsite System Material List is a necessary and important part of the pre-permit system plans. This document <br /> allows us to catch any potential problems before the system is installed and allows you to familiarize yourself with the <br /> materials and construction requirements for the system. This form must be completed, submitted,and approved before • <br /> we can issue a permit. Once approved,this document becomes part of the permit and will be used to perform the <br /> inspection of your installed septic system-- <br /> MATERIAL MATERIAL LIST SECTION <br /> 1. Tank information: Enter septic tank, dosing tank, or septic/dosing tank information (you will not have a dosing tank <br /> if you are constructing a gravity-flow system). .. • <br /> a. Mfg: Is the name of the manufacturer who.made the tank.' • <br /> • b. Capacity: Is the capacity of the tank in gallons' • • <br /> c. Material: Is what material the septic tank is constructed from (concrete, steel, polyethylene, etc...). <br /> 2. Pumping information: This section is only for systems that use pumps, siphons, or effluent filters. Please enter <br /> the data as appropriate orskip this section if your system does not have any of these components. Be sure to <br /> include manufacturer's specifications for all sections that apply. <br /> a. Pump: Enter the manufacturer(MFG) and model of the pump. <br /> b. Hydrosplitter: If you are installing a hydrosplitter, enter the manufacturer and model. Hydrosplitter orifice <br /> selections must be obtained from the manufacturer. <br /> c. Effluent filter If you are installing an effluent filter, enter the manufacturer and model information. <br /> d. Distribution valve: If you are installing a distribution valve, enter the manufacturer and model information. <br /> 3. Effluent transport piping information:The effluent sewer is the pipe that connects the outlet of the septic tank to <br /> the drainfield. The pressure piping is the pipe between the pump discharge and the drainfield: <br /> a. Enter information about the gravity effluent sewer as follows: <br /> Length: Is the length of the effluent sewer. <br /> Diameter: The diameter of the effluent sewer. <br /> Material: Is the actual material from which the pipe is made, and its specification number—an example would <br /> be PVC 3034. <br /> Fall: Is the difference in elevation,.in inches, between the effluent sewer pipe at the outlet of the septic tank <br /> and <br /> the header pipe where it leaves the d-box. <br /> b. Enter information about pressure transport piping as follows: <br /> Length: Enter the length of thepressure piping from the tank to the drainfield, <br /> P P 9. a nfield, the hydrosplitter, or the start of <br /> pressurenetwork. <br /> netwo '. <br /> Diameter: Enter the diameter of the pressure piping that you are going to use. <br /> Material: Enter the actual material from which the pipe is made and its specification number—an example <br /> would be PVC 1120. <br /> PSI: Enter the pressure rating (pounds per square inch or PSI) of the pressure piping that you are going to <br /> use. . <br /> 4. Disposal trenches: <br /> a. Distribution technique:Check the box next to the distribution technique you are going to use. <br /> b. Total Linear Footage: Is the total length of theperforated pipe,9 pipe, chambers, or other approved disposal media_ <br /> It <br /> PP P <br /> does not include headers or other solid pipe. <br /> c. .Drain Media: Check the box to indicate which media you are going to use. Include the total depth of the <br /> drainfield rock(if it is being used), and the depth of the drainfield rock below the pipe. <br /> d. Trench Depth: Is the minimum and maximum depth of the trench below the original ground surface. <br /> e. Capping Fill Depth: If you are constructing a capping fill drainfield, enter the depth of the fill material above the <br /> original ground surface. <br /> f. Setbacks from Wells: Enter the distance(in feet)from the well to the septic tank, to the sand filter or other <br /> treatment device, and to the drainfield. <br /> 5. Dewatering Systems: (If used) <br /> a. Check the box next to the dewatering system that is required. <br /> b. Trench Depth: Is the depth of the dewatering trench below the original ground surface. <br /> c. Drain Media: Check the box to indicate which media you are going to use. Include the total depth of the <br /> drainfield rock(if it is being used), and,for a curtain drain, the depth of the drainfield rock below the pipe. If a <br /> curtain drain is required, filter fabric must be placed above the drain media. <br /> d. Perforated Piping: Enter the diameter and material of the perforated piping that will be used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.