Laserfiche WebLink
Septic Permit 555-23-009955-PRMT Page 2 of 3 <br /> #date tss�i Is15t2Q2 �� cv n -, m�� � � w <br /> lfitork�l3escn fog W FIN,S7 t;14, R REPLCE 1EP1F111:01Mi if II <br /> . . p"�'¢ t, .' .fir �4-x+,v .,.:�. +, ,.vf.. 70k4*. „, <br /> r .,^ ��. &� -f'mac` �«' ���� ,��'�ar",y' �, �K •' <br /> y vy; _ rya ^��a n� <br /> 5 T yyF rh.'" 'c € r -` �taiti7t11rs` ra '' s.➢" `-' <br /> r,,d:.. .9 <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit.It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one <br /> end of the pipe to the other.In addition,there must be a minimum difference of 8 inches between the invert of the <br /> septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial distribution <br /> field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> •Serial distribution,each trench bottom to be level and on contour.Use Drop box(es). <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2.Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> �. <br /> V'O -FV' � PY9'Pa� 9 s f��Pi,qa re. <br /> .xs.���a.ems �, ,,.. a., <br /> System Inspection: No Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: Yes <br /> Comments: A Certificate of Satisfactory Completion was issued on 07/15/2024 and the system is authorized for connection. <br /> v iZts } $'F �1�. �t`a p'' ( w,- ,Wiyyt�y� 4"`' sa,' �6 s� 4 s 'a� - ' <br /> ' d,. 4omp1.tei OPOPF,�k'� - ' Sa' "t F,., o.,>�k`3;�;s ``u 2�.SXi T°p Y' ":.+.,.vZ ^ >r v"? a - <br /> Inspector Inspection Inspection Date Inspection Result <br /> Danielle Brown 7999 Final Septic 07/15/2024 Approved <br /> 7/15/24:10:29:10AM ONS_OnsiteCSC pr <br />