Laserfiche WebLink
• <br /> Oregon Department of Environmental Quality <br /> • <br /> • Dosing tank capacity _(gallons) <br /> • Tank volume determined by:Check all that apply,add comments below as needed <br /> ❑Permit Records❑Measured I❑Stamped on Tank❑Other <br /> • Dosing tank material <br /> • Dosing tank appears to be watertight and in good condition DYes ❑No <br /> . • Dosing tank lid is intact DYes ❑No • <br /> • Electrical components are sealed and watertight DYes ❑No <br /> • . Pump/siphon is functional DYes ❑No <br /> .• Type of Pump ❑Demand.dose DTime dose . <br /> • Pump control mechanism is functional(floats,pressure transducer)DYes ❑No <br /> . • • There is a high water alarm DYes ❑No <br /> • The high water alarm(audible and visual)is working DYes ❑N.o '❑NotApplicable <br /> • Type of screen <br /> • • Screen is clean and free of debris DYes ❑No-Screen cleaned for this evaluation DYes ❑No <br /> • Scum/sludge present in Dosing tank DYes ONo <br /> • Scum layer (inches) Sludge layer (inches) <br /> • • Additional Comments: • <br /> 5. Soil absorption system • <br /> . , The soil absorption system is a set of trenches that receives effluent from the septic tank and • <br /> filters the effluent before it enters the.groundwater. . <br /> • The septic system has a soil absorption system KlYes DNo DUnknown <br /> • • *Was the soil absorption system part of the evaluation?JYes ❑No ❑See note below' <br /> If the soil absorption system was not evaluated,please explain below(for example unable to <br /> locate,client did not authorize this part of the evaluation): , <br /> • -Absorption distribution %Equal ❑Serial ❑Pressure DEqual via pressure <br /> • Absorption lines construction material: • <br /> 0 Gravel and pipe ❑Chamber ❑Tile ❑Polystyrene foam and pipe DOther <br /> • Absorption distribution unit(s):Ddropbox❑hydrosplitterequal distribution box. <br /> '1 V Intact ❑Damaged ❑N/A <br /> • Absorption distribution unit(s)are free of debris or solids Wes. ❑No❑N/A <br /> Page 4 of 8 . <br />