Laserfiche WebLink
Onsite Permit 555-24-002559-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555023424325 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Ctt ,t _.� 3� r_ ?a.m.erg '° �,��Y;t:�,.� <br /> u7t /' f,�, �'f 5 fig? �,; '$g jf ,Arnif" 9 � w <br /> U�fR a to (pt an I' / 14 x i l°r <br /> Max depth: 10 in. Undisturbed soil between trenches: 6 ft. <br /> Min depth: 8 in. Capping fills-min depth of fill material: 12 in. <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Remove catch Basin and use Bentonite on the down hill side of each trench where line to catch basin was <br /> dug in remove pipe.lnstall ball valve to shut off existing drainfield from use and this allow use of drainfield next <br /> year, May considering addition of hydro tech valve in a couple of years.Changing out pump and control panel <br /> to allow for time dosing. <br /> Conditions of approval <br /> 1.Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of <br /> lateral piping with acceptable threaded plugs or caps. Minimum head of 5-ft at remotest <br /> orifice, less than 10%variation. <br /> 3.Filter fabric required over drain media(rapidly permeable soils). <br /> 5.The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system.The maintenance <br /> provider must submit an annual report and annual evaluation fee. <br /> 7.Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> 9.The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> 11.AI1 roof drains must be directed away from the system <br /> 13.Meet all required setbacks <br /> 15.The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> 17.AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system <br /> location or specifications without approval by the agent. <br /> 5/23/24:8:03:15AM ONS_OnsitePermitpr <br />