Septic Permit 555-24-002559-PRMT�F Page 2 of 2
<br /> tw �.44i .(tg.I Ro7 .. �
<br /> � - � .o-�.„� a r_
<br /> �FIO zk s a e. r t
<br /> JREP 4B
<br /> xfi „ ,.r�xx�.� ���,.„ ..,..,„ .� ,,�. �� w;',. s... � :'`�.�� .. .,, _x,- s� ., �• ,...,. �:'.��5',m.�i„, W'r'�.a�; . ., , �„ �+ter,,..,z .,.
<br /> r " ndiftons Cz provar
<br /> F „s ..a _. /,_e ._r.;. ., m .%� .r..3•;. `�' a.au ,,. ,».a.;,�Cct_w, „,• W .� -� ,> T d...� ,.a_ _.'. '>. _ �,r. 3xdfaa ' ..
<br /> 1.Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with
<br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation.
<br /> 3.Filter fabric required over drain media(rapidly permeable soils).
<br /> 5.The owner of a pressurized distribution system must maintain a contract with a certified maintenance
<br /> provider to inspect, adjust and maintain the onsite system.The maintenance provider must submit an
<br /> annual report and annual evaluation fee.
<br /> 7.Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent).
<br /> 9.The system must be installed by the property owner or a licensed sewage disposal business (installer).
<br /> 11.AII roof drains must be directed away from the system
<br /> 13.Meet all required setbacks
<br /> 15.The system must be installed in the area approved during the site evaluation and in accordance with
<br /> the construction plan approved by the agent, including any changes made by the agent.
<br /> 17.AI1 work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or
<br /> specifications without approval by the agent.
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect
<br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance
<br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices,alteration permits,or
<br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment
<br /> of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the
<br /> issuance of this Certificate of Satisfactory Completion.
<br /> N s -. r
<br /> G"erttfiSate o 5 tasfs fl tr cn ettion .., ., X< g,k e?'.„+)u
<br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No
<br /> Comments: COSC Issued ok to connect to system
<br /> w �,air" { {
<br /> `�`± z
<br /> Inspector Inspection Inspection Date Inspection Result
<br /> Kimberlee Aldrich 7460 Drainfield Cap 06/27/2024 Approved
<br /> Kimberlee Aldrich 7400 Gravelless Drainfield 06/13/2024 Approved
<br /> Issued By: Kimberlee Aldrich, Onsite Wastewater Specialist 2 Effective Date: 06/27/2024
<br /> K(1414ye rrLW ALSrri,c,�t. a44.t.Q 6 . t z £ -AJ/Dici
<br /> CALL BEFORE YOU DIG—ITS THE LAW
<br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain
<br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.)
<br /> 6/27/24:2:24:08PM ONS_OnsiteCSC pr
<br />
|