Laserfiche WebLink
Onsite Permit 555-23-009984-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555003628716 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting" in the app store <br /> Date issued: 1/24/24 Expiration date: 1/23/25 <br /> Work description: REINSTATE 22-005281-PRMT-NEW INSTALL 4 BDRM <br /> Min depth: 12 in. Capping fills-min depth of fill material: 18 in. <br /> Special Requirements <br /> Stake out required: No <br /> Other special rqmt: drainfield allready installed at a depth of 12 inches, an 16 inch cap needs to still be placed and seeded. <br /> Conditions of approval <br /> •Capping fill rules at OAR 340-071-0265.Construction must occur in dry soil conditions between June 1 and <br /> October 1 unless otherwise approved by the agent.The cap material must be pre-approved by the agent prior to <br /> placement. Minimum 10-ft between edge of fill and trench. Drainfield area must be scarified.Contact between <br /> native soil and fill must be mixed. Final cap to be seeded and or landscaped to prevent erosion. Protect from <br /> livestock and vehicular traffic. <br /> •Serial distribution.The cap material must be evenly graded to a final depth of 16-inches over the drain media. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division, or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •An anti-buoyancy device is required for the septic tank(s) and must be installed as per the <br /> manufacturer installation guidelines. <br /> 1/24/24:2:32:37PM ONS_OnsitePermitpr <br />