Laserfiche WebLink
E)(PIRED Page e2of3 <br /> Onsite Permit 555-21-01 1 231-PRMT <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555095553137 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting"in the app store <br /> Q:. <br /> 99.. <br /> Special Requirements <br /> Groundwater type: Permanent Groundwater depth: 66 in. <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Sweeps must be installed at the end of all pressure laterals,they must come to the surface with a threaded <br /> cap for maintenance <br /> Conditions of approval <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps.Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be <br /> installed by a person certified by the system manufacturer in accordance with OAR 340-071-0600 and <br /> 0650.See Alternative Treatment Technology rules at OAR 340-071-0345. <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, <br /> Building Codes Division,or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Filter fabric required over drain media(rapidly permeable soils). <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual <br /> report and annual evaluation fee. <br /> •ATT treatment standard 1 required. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the <br /> treatment system malfunctions. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT maintenance provider is <br /> required to Final this permit. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building, electrical,or other codes. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 11/18/21:3:32:29PM ONS_OnsitePermit_pr <br />