My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12022546
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12022546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 10:10:49 AM
Creation date
1/25/2024 3:33:42 PM
Metadata
Fields
Template:
Permits
Permit Address
17085 WALL LN SE
Permit City
Jefferson
Permit Number
555-22-000657-PRMT
Parcel Number
103W13AA00300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-22-000657-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555038200557 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting" in the app store <br /> Date issued:2/28/22 Expiration date:2/28/23 <br /> Work description:MAJ REPAIR EXIST 3 BDRM RES <br /> Max depth: 24 in. Undisturbed soil between trenches: N/A <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Not Applicable Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Remove trees in drainfield area,create 10 foot buffer around seepage bed. <br /> Call in for site inspection prior to install but after trees have been removed. <br /> Conditions of approval <br /> -Remove trees in drainfield area,call in site inspection prior to install. <br /> •Orifices must be drilled at 12 o'clock position,a single orifice at the end of the line may be drilled at <br /> 6 o'clock to prevent damage from freezing or limited use. <br /> •Sweeps must be 45 degree elbows to allow for maintenance of the system. <br /> •Soil backfill must be sourced on site. <br /> •Pressurized distribution rules at OAR 340-071-0275.Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps.Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> •The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect,adjust and maintain the onsite system.The maintenance provider <br /> must submit an annual report and annual evaluation fee. <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, Building Codes <br /> Division,or the municipality with jurisdiction, is required for pump wiring installation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 2/28/22:10:44:07AM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.