My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12022546
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12022546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 10:10:49 AM
Creation date
1/25/2024 3:33:42 PM
Metadata
Fields
Template:
Permits
Permit Address
17085 WALL LN SE
Permit City
Jefferson
Permit Number
555-22-000657-PRMT
Parcel Number
103W13AA00300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-22-000657-PRMT Page 2 of 3 <br /> Date Certificate Issued:01/24/2024 <br /> Work Description: MAJ REPAIR EXIST 3 BDRM RES <br /> Conditions of Approval <br /> •Remove trees in drainfield area,call in site inspection prior to install. <br /> •Orifices must be drilled at 12 o'clock position,a single orifice at the end of the line may be drilled at 6 o'clock to <br /> prevent damage from freezing or limited use. <br /> •Sweeps must be 45 degree elbows to allow for maintenance of the system. <br /> •Soil backfill must be sourced on site. <br /> •Pressurized distribution rules at OAR 340-071-0275.Install sweep elbows at ends of lateral piping with acceptable <br /> threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance provider to <br /> inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual report and annual <br /> evaluation fee. <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, Building Codes Division,or the <br /> municipality with jurisdiction, is required for pump wiring installation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 1/24/24:12:59:16PM ONS_OnsiteCSC pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.