My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12022492
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12022492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 11:19:26 AM
Creation date
1/25/2024 3:22:41 PM
Metadata
Fields
Template:
Permits
Permit Address
3090 JEFFERSON SCIO DR SE
Permit City
Jefferson
Permit Number
555-22-000881-PRMT
Parcel Number
103W13 00500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 Note: Inspection/Maintenance frequency,on this system is at start-up and then once every 12 months.On <br /> existing systems, Maintenance starts on contract signing then once every 12 months. <br /> Standard maintenance,testing and reporting shall be performed during normal business hours Monday through <br /> Friday(excluding holidays)on a pre-scheduled basis as Service Provider deems necessary or advisable. <br /> At each service the System shall be inspected and serviced in accordance with the instructions in the Systems <br /> O&M Manual, Additionally,an effluent quality inspection consisting of a visual assessment of color,turbidity, <br /> and scum overflow and an olfactory assessment for odor shall be performed. <br /> The Service Provider will affix a"For Service,Call " label near the control panel's alarm signal. <br /> Performance of the yearly Inspection/Service visits shall include notification of needed repair, replacement or <br /> addition of parts used In the system. <br /> The Service Provider shall notify the owner in writing if any improper system operation that cannot be remedied <br /> at the time of servicing. The written notification shall include an estimated date of correction. <br /> Service Provider shall perform the following services that are listed below: <br /> 1. Perform a visual inspection of treatment system and drain field <br /> 2. Pull, inspect,clean,and reinstall all removable parts. <br /> 3. Inspect pumps for proper operation. (flow,amps,volts) <br /> 4. Check all hydro-splitters and tech valve <br /> 5. Inspect septic tanks,pump vaults and pump tank for sludge and scum quantity. NOTE: Tanks will be <br /> pumped at owner's expense if required. <br /> 6. Inspect risers and lid for damage and insure those lids are secured properly. <br /> 7. Test alarm system and insure that control panels are operating correctly. <br /> 8. Check drain field area for problems, IE.,surfacing, ponding,traffic <br /> 9. Take all readings from the panels and keep record of all readings <br /> 10. Inform owner if anything needs to be fixed, repaired or pumped. <br /> 11. Pull DEQ required samples and have them tested(if required) <br /> The Contractor may, but shall not be required to,provide services hereunder if the Customer: <br /> makes alterations or modifications to the System,or <br /> misuses the System,or <br /> attaches devices to it not supplied by its original supplier,or <br /> performs or attempts to perform any type of Maintenance services on the system or any portion thereof. <br /> During the term hereof,Customer shall provide the Contractor with access to the System. Access includes <br /> electrical controls&disconnects,and sufficient workspace to perform the necessary maintenance services. <br /> 2.0 TERMS OF AGREEMENT <br /> This Agreement shall be for a period of 24 months from the date of system start-up,or on the date <br /> Contract is signed on an existing system unless otherwise terminated or cancelled by either party as provided <br /> herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.