My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12022492
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12022492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 11:19:26 AM
Creation date
1/25/2024 3:22:41 PM
Metadata
Fields
Template:
Permits
Permit Address
3090 JEFFERSON SCIO DR SE
Permit City
Jefferson
Permit Number
555-22-000881-PRMT
Parcel Number
103W13 00500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-22-000881-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555027369176 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Bate issuer �g �1i i • w Iratl tl `' 3 <br /> Work descripban NEW t44STA B D PRESSURIZED DISTRIBd T 6N 9 <br /> 3 � <br /> Max depth: 30 in. Undisturbed soil between trenches: 8 ft. <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: Yes <br /> Groundwater type: Permanent Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Orifices will need to be drilled at 1/8 inch and spaced every 24 inches,each lateral will need the last orifice to <br /> be drilled downward to allow for drainage of line. See attached documents for proper manifold configuration <br /> and construction <br /> Conditions of approval <br /> 'Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping <br /> with acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10% <br /> variation. Filter fabric required over drain media (rapidly permeable soils). The owner of a pressurized <br /> distribution system must maintain a contract with a certified maintenance provider to inspect, adjust <br /> and maintain the onsite system. The maintenance provider must submit an annual report and annual <br /> evaluation fee. <br /> •Dry soil installation only (June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> 'All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty- inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater than <br /> 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> 'All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes. An electrical permit and inspection from the <br /> Department of Consumer and Business Services, Building Codes Division, or the municipality with <br /> jurisdiction, is required for pump wiring installation. <br /> 'Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> 'A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> 3/9/22:8:09:27AM ONS_OnsitePermit_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.