Laserfiche WebLink
Onsite Permit 555-23-003298-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555066836823 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting" in the app store <br /> Date issued:6/16/23 Expiration date:6/15/24 <br /> Work description: MAJ REP: REPL 3 BDRM SFD WITH 3 BDRM SFD SAME LOCATION, NEW TANK AND DF <br /> 1 in. N/A <br /> 8 Cappingfills-min depth of fill material: <br /> Min depth: s p <br /> Special Requirements <br /> Groundwater type: Temporary Groundwater depth: 25 in. <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Other special rqmt: Capping fill is ok if 1 inch variation cannot be met. <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the <br /> manufacturer installation guidelines. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •AII roof drains must be directed away from the system <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division, or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> •Equal distribution,all trench bottoms must be at the same elevation.Use Distribution box(es). <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 6/16/23:3:33:24PM ONS_OnsitePermitpr <br />