Laserfiche WebLink
Septic Site Evaluation 555-23-010340-EVAL Page 2 of 2 <br /> Date issued:01/04/202 �� �� <br /> Application status:Site Evaluation Approved 1 41,M� NP' ¢" <br /> Work description:SE: TO ESTABLISH REPAIR AREA(PLA23-021) a' `' � <br /> Special Requirements Initial System Replacement Area <br /> Groundwater type: N/A Temporary <br /> Groundwater depth: N/A 19 in. <br /> Drainfield type: N/A Standard <br /> Drainfield sizing: N/A 150 linear ft/150 gal. <br /> Other special requirement: N/A A capping fill may be needed if burial depth <br /> cannot be achieved. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities, etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> s \0) 63 <br /> Danielle Brown Onsite Wastewater Inspector 2 1/4/24 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 1/4/24:8:25:35AM Page 2 of 2 ONS_OnsiteEvaluationpr <br />