My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12016119
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
12016119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 8:00:17 PM
Creation date
1/19/2024 3:15:15 PM
Metadata
Fields
Template:
Permits
Permit Address
3460 SUMMERS LN SE
Permit City
Turner
Permit Number
555-23-005375-PRMT
Parcel Number
093W12D 00800
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-23-005375-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555029284752 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store <br /> r ✓' F N <br /> Date issue } p �on� 6122/24 <br /> Work de"s' R;MINovulat ALT TO ADD PUMP TANK FOR SHOP P 'NO <br /> Conditions of approval <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface. Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> Meet all required setbacks <br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes. An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 6/23/23:12:06:09PM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.