My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12007640
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12007640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 2:47:10 PM
Creation date
1/9/2024 11:09:05 AM
Metadata
Fields
Template:
Permits
Permit Address
20687 HIGHWAY 99E NE
Permit City
Aurora
Permit Number
555-22-009197-PRMT-01
Parcel Number
041W13C 00500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-22-009197-PRMT-01 Page 2 of 2 <br /> Date Certificate Issued: 11/16/2023 <br /> Work Description: AUTH MIN ALT: ADD DAYCARE TO EXIST CHRUCH MAX 49 CHILDREN/STAFF COMBINED <br /> Conditions of Approval <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices,alteration permits, or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill (cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Certificate of Satisfactory Completion <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> Completed Inspections <br /> Inspector Inspection Inspection Date Inspection Result <br /> Danielle Brown 7999 Final Septic 11/15/2023 Approved <br /> EH io 33-i-S <br /> Danielle Brow Onsite Wastewater Inspector 2 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 11/16/23:8:27:12AM ONS_OnsiteCSC pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.