Laserfiche WebLink
Onsite Permit 555-23-002152-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555037787381 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting" in the app store <br /> Date issued:3/23/23 Expiration date: 3/22/24 <br /> Work description: NEW INSTALL FOR FUTURE 4 BDRM SFD <br /> Special Requirements <br /> Stake out required: No <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building, electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Equal distribution,all trench bottoms must be at the same elevation. Use Distribution box(es). <br /> 3/23/23:2:30:34PM ONS_OnsitePermit.pr <br />