r <br /> DodlSign Envelope D:AE1BBADO-SF9B-422E-11i51-70B5D9C67000 <br /> SPECIFICATION FOR CORRUGATED STEEL PIPE-GALVANIZED STEEL' <br /> SCOPE INSTALLATION <br /> THIS SPECIFICATION COVERS THE MANUFACTURE AND SHALL BE IN ACCORDANCE WITH AASHTO STANDARD <br /> INSTALLATION OF THE GALVANIZED CORRUGATED STEEL SPECIFICATIONS FOR HIGHWAY BRIDGES.SECTION 26,DIVISION H <br /> PIPEICSP)DETAILED IN THE PROJECT PLANS. OR ASTM A 708 AND IN CONFORMANCE WITH TIE PROJECT PLANS <br /> AND SPECIFICATIONS.IF THERE ARE ANY INCONSISTENCIES OR <br /> MATERIALS CONFLICTS.THE CONTRACTOR MUST BRING THEM TO THE <br /> ATTENTION OF THE SITE ENGINEER. <br /> NOTES THE GALVANIZED STEEL COILS SHALL CONFORM TO THE <br /> APPLICABLE REQUIREMENTS OF AASHTO M 218 OR AS TM A 929. IT IS RESPONSIBIUTYOF THE CONTRACTORS TO FOLLOW OSHA <br /> 1.)ALL ELEVATIONS.DIMENSIONS AND LOCATIONS OF RISERS AND VETS. GUIDELINES FOR SAFE PRACTICES. <br /> SHALL BE VERIFIED BY THE ENGINEER PRIOR TO RELEASING FOR FABRICATION. PIPE <br /> CONS I RUC I ION LOADS <br /> 2.)N SITUATIONS WHERE A FOE-GRAINED BACKFI L MATERIAL IS USED ADJACENT TO THE PPE T£CSP SHALL BE MANUFACTURED IN ACCORDANCE WITH TIE <br /> SYSTEM.AND ESPECIALLY WA SITUATIONS INVOLVING HIGH GROUNDWATER TABLES. APPLICABLE REQUIREMENTS NTS OF AASHTO M-36 OR ASTM A 760. CONSTRUCTION LOADS MAY PE HIGHER THAT FINAL LOADS. <br /> CONSIDERATION SHOULD BE GIVEN 10 HIE USE OF GASKETED PIPE JOINTS.AT THE VERY LEAST. THE PIPE SIZES.GAGES MD CORRUGATIONS SHALL BL AS FOLLOW THE MANUFACTURERS OR NCSPAS GUIDELINES. <br /> THE PIPE JOINTS SHOW O BF WRAPPED N A SUITABLE.NONWOVEN GEOTEXTILE FABRIC TO SHOWN ON THE PROJECT PLANS. <br /> PREVENT NEITRATION OF FINES INTO THE PIPE SYSTEM. <br /> 3.)ALL FITTINGS AND REINFORCEMENT COMPLY WITH ASTM A99B. ALL FABSEION OF THE PRODIIC i SHALL OCCUR WITHIN THE <br /> UNITED STATES. <br /> 4.)STD 1 EH MADE FROM'17 0,22l370?.AL72,TOGA.,CARP. HANDLING AND ASSEMBLY <br /> 53 MINIMUM COVER HEIGHT FOR PIPE DESCRIBED WI NOTE I4 IS 17. SHALL BC IN ACCORDANCE WITH NCSPAS(NATIONAL <br /> CORRUGATED STEEL PIPE ASSOCIATION)RECOMMENDATION`: <br /> 6 1 CONSIDERATIONS FOR CONSTRUCTION EQUIPMENT LOADS MUST BE TAKEN INTO ACCOUNT.SEE <br /> IX NAM.ON THIS PAGE <br /> 7.)ALL PIPE DIMENSIONS ARE SUBJECT TO MANUFACTURERS TOLERANCES. MATERIAL SPECIFICATION <br /> B.)ALL RISERS A STUBS ARE 2 5 X IY4`CORRUGATION AND 16 GAGE.UNLESS OTHERWISE NOTED. SCALE:N.T.S. <br /> AND <br /> INSTALLATION SPECIFICATION <br /> PRE—CONSTRUCTION MEETING TEMPORARY COVER 1 <br /> FOR CONSTRUCTION1N-' <br /> PRIOR TO INSTALLATION OF THE DRAINAGE SYSTEM A PRE[CONSTRUCTIN LOADS <br /> MEE I HNG SHALL BE C(NDUC TED.THOSE REOl1REU TO Al MEMO ARE THE O <br /> SLEPT PER OF THE DRAINAGE SYSTEM,THE GFNFRAL.CONTRACTOR,SUB CONTRACTORS AM)THE ENGINEER. I o <br /> —1-EIGHT Of COVER <br /> FOUNDATION/BEDDING PREPARATION <br /> I it <br /> FINISHED GRADE <br /> PRIOR TO PLACING THE BEDOIIIG.TIE FOUNDATION MUST BE CONSTRUCTED TO A UNIFORM AND STABLE GRADE.N THE EVENT THAT UNSUITABLE / - <br /> I OLNDAI ION MATERIALS ARE ENCOUNTERED DURING EXCAVATION.THEY SHALL BE REMOVED AND BROUGHT BACK SO THE GRADE WITH A FILL <br /> MATERIN AS APPROVED BY THE ENGINEER ONCE TIE FOUNDATION PREPARATION IS COMPLETE.THE 4 INCHES OF A WELL GRADED GRAMMAR <br /> MAI I-EAT SHALT.BE PLACED AS THE BEDDING_ <br /> RAC KFII I <br /> THE BACKFILL SHALL BE AN A I.A2 OR A3 GRANULAR FILL PER AASHTO - <br /> AI-'45 OR A WELL-GRADED GRANULAR FILL AS APPROVED BY THE ENGINEER <br /> 1 / t <br /> • <br /> (SEE INSTALLATION GUIDELINES)THE MATERIAL SHALL BE PLACED WI&INCH <br /> LOOSE LIFTS AND COMPACTED TO 00%AASHTO T99 STANDARD PROCTOR <br /> DENSITY. WHEN PLACING TIE FIRST LIFTS OF BACKFILL IT IS IMPORTANT TO <br /> MAKE SURE THAT THE BACKER(IS PROPERLY COMPACTED UNDER AND CONSTRUCTION LOADS: <br /> AROUND TIE PIPE HAUNCHES.BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN A TWO LET DIFFERENTIAL BETWEEN ANY OF THE FOR TEMPORARY CONSTRUCTION VEHICLE LOADS,AN EXTRA AMOUNT OF COMPACTED COVER MAY <br /> PIPES AT ANY TIME DURING THE BACKFILL PROCESS.THE BACKFILL SHALL BE ADVANCED ALONG THE LENGTH OF THE DRAINAGE SYSTEM AT THE BE REQUIRED OVER THE TOP OF THE PIPE.THE HEIGHT-OF-COVER SHALL MEET THE MINIMUM <br /> SAME RATE TO AVOID DIFFERENTIAL LOADING ON THE PPE. REQUIREMENTS SHOWN IN THE TABLE BELOW.THE USE 01-HEAVY CONSTRUC I ION EQUIPMENT <br /> } NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED GRADE COVER MINIMUMS FOR <br /> OTHER ALTERNATE BACKFILL MATERIAL MAY BE ALLOWED DEPENDING ON SITE SPECIFIC CONDITIONS.REFER TO TYPICAL SNAFU_(DETAIL WITHIN NORMAL HIGHWAY TRAFFIC. <br /> T HIS SL I 01 PLANS I OR N YE_ RI L 01 MA H LAL REWIRED. 'MINIMUM COVER MAY VARY.DEPENDING ON LOCAL CONDITIONS. <br /> AXLE LOADS(KIPS) TIE CONTRACTOR MUST PROVIDE TILE ADDITIONAL COVER <br /> MINIMUM COVER DIAMETERS 18-50 ' 5045 I 75110 1110-150 REQUIRED TO AVOID DAMAGE TO THE PIPE. MINIMUM COVER IS <br /> I BACKFILL SHALL BE PLACED TO THE PROPER ELEVATION OVER THE SYSTEM AS OUTLIER N THE PLANS.MINIMUM COVER FOR CONSTRUCTKN MEASURED FROM THE TOP OF THE PIPE TO THE TOP OF THE <br /> LOADING lNNH411M COVER IFTI MAINTAINED CONSTRUCT ION ROADWAY SURFACE. <br /> B NEEDS TO BE DETERMINED BASED ON THE TYPE OF EQUIPMENT THAT IS PLANNED FOR CONSTRUCTION.PROPER COVER FOR CONSTRUCTIONP t�4r 2.0 25 30 30 <br /> e EQUMENT SHALL BE DETERMINED ED PRIOR TO THE PRE-CONSTRUCTION MEETING BY THE ENGINEER. 15.4/3. 30 3.0 3.5 4.0 <br /> 11 78.1 AP 3.0 3.5 4.0 co <br /> a126'tN.t' 35 4.0 4.5 (5 <br /> CONSTRUCTION LOADING DIAGRAM <br /> g N.T.S <br /> I T_ 736366-010-SD-CON-A <br /> ATF <br /> `�wp,.`� ^�c,a�.: W':`1.`'.� A� �r77)8)66 510� n7/19/2023 <br /> �� NTECH' 1Y CARP-73636fr010 <br /> .""""""""Mant. <br /> "" [HORS W UNDO E TIC [IQ®® WOODBURN STORAGE-STOREIT STORAGE 1,1,...0 <br /> xXX �`DR <br /> c._ •_ _ Co/A.°'E9.cm, WOODBURN,OR "°O <br /> cm/NEN xxx • <br /> xxx <br /> E. <br /> j'��_,ll ed 4„40 We m«. CONTRACT SITE DESIGNATION:DRAINAGE BGY338-,1u 513i,5,000 513445,993 FAx PRAWNS <br /> r".....-, �'WM DATE REVISION DESCR/PTION ov 11 11 <br /> r <br />