Laserfiche WebLink
Onsite Permit 555-23-000912-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555042228854 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued:3/21/23 Expiration date: 3/20/24 <br /> Work description: MAJ ALT: ADD PUMP TANK FOR ACCR <br /> Media type: Other- Indicate Product/Manufacturer Media depth: N/A <br /> Media type description: EZ Flow <br /> Trench length: 220 linear ft. Rock above pipe: N/A <br /> Max depth: 36 in. Undisturbed soil between trenches: N/A <br /> Min depth: 24 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Groundwater type: Not Applicable Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Replacing 220 linear feet of drainfield underneath accessory building on the property. <br /> Effluent line and Water lines can run in the same trench persuant to OAR 340-071-0220(1)(C) <br /> Conditions of approval <br /> •Effluent lines and water lines may run in the same trench,see OAR 340-071-0220(1)(j)(C)for <br /> requirements. <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, <br /> Building Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building, electrical,or other codes. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Maximum length of an individual trench is 150-feet. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 3/21/23:2:27:11PM ONS_OnsitePermit_pr <br />