My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11990373
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
11990373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 4:14:49 PM
Creation date
12/22/2023 3:27:32 PM
Metadata
Fields
Template:
Permits
Permit Address
4394 71ST AVE SE
Permit City
Salem
Permit Number
555-23-000912-PRMT
Parcel Number
082W10D 01300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-23-000912-PRMT Page 2 of 3 <br /> Date Certificate Issued: 12/07/2023 <br /> Work Description: MAJ ALT: ADD PUMP TANK FOR ACCR <br /> Conditions of Approval <br /> •Effluent lines and water lines may run in the same trench,see OAR 340-071-0220(1)(j)(C)for requirements. <br /> •An electrical permit and inspection from the Department of Consumer and Business Services,Building Codes <br /> Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> 'Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Maximum length of an individual trench is 150-feet. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665, this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill (cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 12/7/23:2:42:25PM ONS_OnsiteCSCpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.