Laserfiche WebLink
Septic Site Evaluation 555-23-007095-EVAL Page 2 of 2 <br /> Date issued: 12/21/2023 <br /> Application status:Site Evaluation Approved <br /> Work description:SE: 4 BDRM SFD(LOT 6 OF 7, P/PLA 22-011) <br /> Groundwater depth: 24 in. 24 in. <br /> Groundwater interceptor-amount of drain media: 36 in. 36 in. <br /> Groundwater interceptor depth: 48 in. 48 in. <br /> Drainfield type: Standard Standard <br /> Drainfield sizing: 50 linear ft/150 gal. 50 linear ft/150 gal. <br /> Pump to drainfield required: Yes Yes <br /> Other special requirement: OK for curtain drain, if space allows. OK for curtain drain, if space allows. Install <br /> Install depth for drainfield with curtain drain depth for drainfield with curtain drain is 18" <br /> is 18"min, 24"max. min, 24"max. <br /> Could also use gravelless on reduced Could also use gravelless on reduced centers <br /> centers for space 10"min depth, 10"max for space 10"min depth, 10"max depth. <br /> depth. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities,etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system, specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> Pi; Ns r022 7-r;?-c— <br /> Aidan Bammes Onsite Wastewater Specialist 2 12/21/23 <br /> CALL BEFORE YOU DIGITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note.The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 12/21/23:8:17:16AM Page 2 of 2 ONS_OnsiteEvaluation_pr <br />