Laserfiche WebLink
Septic Site Evaluation 555-23-008787-EVAL Page 2 of 2 <br /> Date issued: 12/07/2023 <br /> Application status: Site Evaluation Approved <br /> Work description: SE FOR FUTURE 3BDRM SFD EASEMENT FOR 15992 STORMY DR NE(PREV SE VOIDED) <br /> Trench Specifications Initial System Replacement Area <br /> Trench linear feet: 375 linear ft. 375 linear ft. <br /> Max depth: 30 in. 30 in. <br /> Min depth: 24 in. 24 in. <br /> Special Requirements Initial System Replacement Area <br /> Stakeout required: Yes Yes <br /> Groundwater type: Not Applicable Not Applicable <br /> Drainfield type: Standard Standard <br /> Drainfield sizing: 125 linear ft/150 gal. 125 linear ft/150 gal. <br /> Other special requirement: Easement Required prior to permit, Easement Required prior to permit, easement <br /> easement must be completely staked out must be completely staked out with repair <br /> with drainfield drainfield <br /> Could be ATT TS1 approval, see field Could be ATT TS1 approval, see field notes for <br /> notes for details. details. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system. Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities,etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system, specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> iCF lefS (a Z2 -,5----- <br /> L Aidan Bammes Onsite Wastewater Specialist 2 12/7/23 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 12/7/23:5:15:03PM Page 2 of 2 ONS_OnsiteEvaluationpr <br />