Laserfiche WebLink
Septic Permit 555-23-008672-PRMT Page 2 of 3 <br /> `bate Certificate tssued tfi/29/2023t �� <br /> • <br /> Work Descnptlan MIIV REP DUPLEX,1 BDRM EACH SIDE <br /> �'r s Conditions of Approval �� <br /> -This repair permit is for a Tank Replacement Only. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •AII roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty- <br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. <br /> Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> for product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> -A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on top of the <br /> effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Effluent sewer. The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one <br /> end of the pipe to the other. In addition, there must be a minimum difference of 8 inches between the invert of the <br /> septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial distribution <br /> field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2.Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 11/29/23:3:44:15PM ONS_OnsiteCSC_pr <br />