Laserfiche WebLink
Onsite Permit 555-23-004764-PRMT Page 5 of 7 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555045328217 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> as a, , � ,�� � g a�a»s, a uy�:� 1��, u.ag�� _--"� <br /> bate lssct�$122i` � 9� � � �� ����� ����° � a � ���53 � �� � E`xpirat�On <br /> ice ���'��� '� <br /> ,Sa'a �a�� <br /> Work description MAJ gEp 3 BDRM F0 y „r <br /> Nuya'x" `�"' ',a'FS , �` a2n P✓� d 'a" <br /> ,..t.. .v,.��„ ...... .;t.« ,�,� ,�'ahav�rx�.me„ ... �, ar.�'�,� °°,asw'�.�,��«$���. - ,2�- ..v�.BP✓. .;y .. <br /> Conditions of approval <br /> •ATT treatment standard 2 required. <br /> •The septic tank must be approved for use with the ATT system to be installed. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT <br /> maintenance provider is required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider <br /> certified by the manufacturer to inspect, adjust and maintain the onsite system.The <br /> maintenance provider must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ <br /> website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> 8/22/23:1:48:04PM ONS_OnsitePermitpr <br />