Laserfiche WebLink
I : r <br /> Connection Point of the <br /> Connection point of re-located relocated 2"PVC pipe flowing to the <br /> 2"PVC i flo ' he-pu • h drainfield coming from the pump tank at the <br /> Flow on the south end of lir <br /> south end of building#9. <br /> Building#9. <br /> Pp o CB <br /> iAPPROVEGDRAINI A�I�_GBL01LT <br /> 3 <br /> 0 <br /> It <br /> 1 .Existing Warehouse <br /> /. Installed,'- new H-,2 rated p p tank <br /> with •ump to/serve ne restroo <br /> New Addition to Warehouse <br /> 3 <br /> / <br /> n <br /> i <br /> Connection Point of the <br /> relocated 2"PVC pipe flowing to the <br /> action p ' t of re-loa ted ,/ drainfield coming from the pump tank at the <br /> 2"PV Co*pe flowi g'o the p • p tank so Appruth end of building#9. <br /> on the s• end o <br /> Building •o <br /> Proposed:r ildinp 2 <br /> 411 id <br /> Existing Build',g <br /> Illf- <br /> /1 ' 8 RO ART IN t <br /> I Tank installed under <br /> Flow # 555-18-001300 <br /> As Built Drawing of a new pump tank installed for Pratum CO-OP page 1 of 2 <br /> Zollirsc er serving builI ng#9. <br /> Ex=w�tlr•p. 1r•o_ <br /> Site Address:8955 Sunnyview Rd Salem,OR Date: 5/23/22 <br /> P.O.BOX 338aved0r"4"73°/ Marion County permit#22-002106 <br /> 5034373-8927 <br /> COBS 02ns" ocoiaers" Overall View-See attached details on oaae 2. Drawn By: T.ZOLLINGER <br />