My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11979722
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
11979722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 10:56:00 AM
Creation date
12/14/2023 4:01:20 PM
Metadata
Fields
Template:
Permits
Permit Address
17605 PAINTER LOOP NE
Permit City
Hubbard
Permit Number
555-23-008380-PRMT
Parcel Number
041W34CC00400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> ONSITE SYSTEM MATERIAL LIST INSTRUCTION SHEET <br /> • <br /> The Onsite System Material List is a necessary and important part of the pre-permit system plans. .This document allows <br /> us to catch,any potential problems before the system is installed and allows you to familiarize yourself with the materials <br /> and construction requirements for the system. This form must be completed, submitted, and approved before we can <br /> issue a permit..Once approved,this document becomes part of the permit and will be used to perform the inspection of <br /> your installed septic system. <br /> MATERIAL LIST SECTION <br /> 1. Tank information: Enter septic tank, dosing tank, or septic/dosing tank.information (you will not have a dosing tank if <br /> you are constructing,a gravity-flow system). - <br /> a. Mfg: Is the name of the manufacturer who made the tank. <br /> b. Capacity: Is the capacity of the tank in gallons.. <br /> c. Material: Is what material the septic tank is constructed from (concrete; steel, polyethylene, etc...). <br /> 2. .Pumping information: This section is only for systems that use pumps, siphons, or effluent.filters. Please enter the <br /> data as appropriate or skip this section if your system does not have any of these components. Be sure to include <br /> manufacturer's specifications for all sections that apply. • <br /> a. Pump: Enter the manufacturer(MFG) and model of the pump. <br /> b. Hydrosplitter. If you are installing a hydrosplitter, enter the manufacturer and model. Hydrosplitter orifice <br /> selections must-be obtained from the manufacturer, <br /> c. Effluent filter: If you are installing an effluent filter, enter the manufacturer and model information. <br /> d. Distribution valve: If you are installing a distribution valve, enter the manufacturer and model information. <br /> 3. Effluent transport piping information:The effluent sewer is the pipe that connects the outlet of the septic tank to <br /> the drainfield. The pressure piping is the pipe between the pump discharge and the drainfield. <br /> a. Enter information about the gravity effluent sewer as follows: . <br /> Length: Is the length of the effluent sewer. <br /> Diameter: The diameter of the effluent sewer. <br /> Material: Is the actual material from which the pipe is made, and its specification number—an example would <br /> be PVC 3034. <br /> Fall: Is the difference in elevation, in inches, between the effluent`•sewer pipe at the outlet of the septic tank and <br /> tha header pipe where it leaves the d-box. <br /> b. Enter information about pressure transport piping as follows: <br /> • Length: Enter the length of the pressure piping from the tank to the drainfield, the hydrosplitter, or the start of • <br /> the pressure network. • <br /> Diameter: Enter-the diameter of the pressure piping that you are going to use. <br /> Material: Enter the actual material from which the pipe is made and its specification number—an example <br /> would be PVC 1120. <br /> PSI: Enter the pressure rating (pounds per square inch or PSI) of the pressure piping that you are going to use. <br /> 4. Disposal trenches: <br /> a. Distribution technique: Check the box next to the distribution technique you ara going to use. . <br /> b.- Total Linear Footage: Is the total length of the perforated pipe, chambers, or other approved disposal media. It <br /> does not include headers or other solid pipe. • <br /> c. Drain Media: Check the box to indicate which media you are going to Use. Include the total depth of the <br /> drainfield rock(if it is being used), and the depth of the drainfield rock below the pipe. • <br /> d. Trench Depth: Is the minimum and maximum depth of the trench below the original ground surface. <br /> e. Capping Fill Depth: If you are constructing a capping fill drainfield, enter the depth of the fill material above the <br /> -original ground surface. - <br /> f. Setbacks from Wells: Enter the distance(in feet)from the well to the septic tank,to the sand filter or other <br /> treatment device, and to the drainfield.. <br /> 5. Dewatering Systems: (If used) <br /> a. .Check the box next to the dewatering system that is required. <br /> b. Trench Depth: Is the depth of the dewatering trench below the original ground surface. <br /> c. Drain Media: Check the box to indicate which media you are going to use. Include the total depth of the <br /> drainfield rock(if it is being used), and, for a curtain drain, the depth of the drainfield rock below the pipe. If a <br /> curtain drain is required, filter fabric must be placed above the drain media. <br /> • d. Perforated Piping: Enter the diameter and material of the perforated piping that will be used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.