My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11978732
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11978732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:20:10 PM
Creation date
12/14/2023 11:18:33 AM
Metadata
Fields
Template:
Permits
Permit Address
6015 BARCELONA DR SE
Permit City
Salem
Permit Number
555-22-007282-PRMT
Parcel Number
082W20A 00400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-22-007282-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555052859499 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting"in the app store <br /> D,to Issued 8)17f22ri � ._ � xpiration date 8/t <br /> Work.description:N ,W)NSTA.V-::-?;-.0-PMA'SFD <br /> y <br /> �. ..,ate_ ,�, ..' .�....:.. ...,. > .. _..,. ..- .-^. `�•: ��. -" ,,. ,_,_,,.,,,, . .., .,a�t'�, - P *__._„_.. ...... ...... ... .. ..� a. <br /> i <br /> Stake out required: Yes <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: operation and maintenance agreement required for the life of the system, must have an electrical permit and <br /> the electrical must be finalled to final the septic install permit <br /> Conditions of approval <br /> -This permit is for the installation of an Alternative Treatment Technology(ATT) system and <br /> is to be installed by a person certified by the system manufacturer in accordance with OAR <br /> 340-071-0600 and 0650. See Alternative Treatment Technology rules at OAR 340-071-0345. <br /> -ATT treatment standard 1 required. <br /> -In addition to the As-Built and Materials List, a Start-Up checklist from the ATT <br /> maintenance provider is required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider <br /> certified by the manufacturer to inspect, adjust and maintain the onsite system.The <br /> maintenance provider must submit an annual report and annual evaluation fee. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> -For product approval information and manufacturer installation requirements see DEQ <br /> website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> -Install the pump and system,components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> 8/17/22:9:21:41AM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.