Laserfiche WebLink
Marion County <br /> Certificate of Satisfactory Completion 5155 Silverton Rd NE <br /> Salem, OR 97305 <br /> Marion. <br /> ,COUTUY Installation Permit - Residential - New 503-588-5147 <br /> Building@co.marion.or.us <br /> :o:R'E;G o:r 555-23-008221-PRMT Website:co.marion.or.us <br /> Date Certificate Issued,`11/01/2023 ns z� g ` <br /> 1iOrk 13escnptron <br /> NEW INSTALL.3 FOR FUTURE'4BDRM SFD SE DONE UNDER 2995 RIt3GEW1�Yj�" `` <br /> Applicant: Dwain Bethel&Sons Excavation, Inc. Primary Contractor: Dwain Bethel&Sons Excavation, <br /> Address: PO Box 504 Inc. <br /> Turner OR 97392 Installer License:36198 <br /> Phone: 5037432343 Address: PO Box 504 <br /> Email: office@bethelexc.com Turner OR 97392 <br /> Phone: 5037432343 <br /> Email: office@bethelexc.com <br /> Owner: JAMES, ROBERT Property Address: 9805 Deep Ln SE,Turner, OR 97392 <br /> Address: 9795 DEEP LN SE <br /> TURNER OR 97392 <br /> Parcel:093W01C 00401 -Primary <br /> 2 Acres Water Supply:Lot Size: pp y: Well <br /> Zoning: N/A City/County/UGB: N/A <br /> Land Use Approval: N/A <br /> Category of Construction: Single Family Dwelling <br /> Use of Structure: N/A 4BDRM Single Family <br /> Dwelling <br /> Number of Bedrooms: 0 4 <br /> System Specifications <br /> Type: Standard <br /> Max Peak Design Flow: 450 gpd. Proposed Flow: 225 gpd. <br /> Min Septic Tank Volume: 1000 gal. Min Dosing Tank Volume: N/A <br /> Special Tank Requirements: 1000-gallon Waite concrete tank <br /> Drain Field Specifications <br /> Drain Field Type: Standard System Distribution Type: Serial <br /> Drainfield Sizing: 125 linear ft. Distribution Method: Serial <br /> Media Type: ez-flow Media Depth: N/A <br /> Trench Length: 375 linear ft. Rock Above Pipe: N/A <br /> Max Depth: 30 in. Undisturbed Soil BetweenTrenches: 10 ft. <br /> Min Depth: 24 in. Capping Fills-Min Depth of Fill Material: N/A <br /> Special Requirements <br /> Groundwater Type: Not Applicable Groundwater Depth: N/A <br /> Other Special Rquirements: Install Drainfield as shallow as possible,slow soils <br /> Keep a 50ft setback from the drainfield to the cut bank <br /> 11/1/23:10:21:31AM ONS_OnsiteCSC pr <br />