I .
<br /> Onsite Permit 555-20-004914-PRMT Page 3 of 3
<br /> Schedule or track inspections at www.buildingpermits.oregon.gov
<br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555087922095
<br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store
<br /> ataissued fir?120 ,,° ,e ;;° °c g *.c •; , 'x 0 &q :� z o: :„ � +p ,�_ .� Expiration date 71�.•7/21
<br /> rt, c.5sk Q n,+ °� �u g.. ;py 9 r;,y, �A,ob 3 .,kt gk'•,� f � `nt64 t9 .'PP
<br /> cirk'deSCOPtian MA.lW- -1'.BE RM-SF� G V t b ti o � m b{ 8 �e �41. CYP I.
<br /> ?OP b' bs .q. m .off b ^e , Y ° '��'k =: ;'Pond vy •�1,,, d1.1
<br /> t ,yu�wv k $. l� 4 +, y},��, '; �� s y_a �[ 'l.."ae o ' v y ..y 'gym' n e,..; 1jF y�,, as �Q�,
<br /> ... n .. I e^ p ... "" i,� � AhM¢��.711`4' �r.'rt i�6Pq �k-' CO):R.�.R ".LWtY.s�tT��+�.,w i�+r$h"r��C�i4m: ..-�� ..Q-�t�34:
<br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system
<br /> specified above.
<br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at:
<br /> http://www.deq.state.or.us/wq/onsite/onsite.htm
<br /> General Conditions And Requirements For All Permits:
<br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is
<br /> noted on`this permit.Renewal of a permit may be granted if an application for permit renewal is received
<br /> before the permit expiration date.Reinstatement of a permit may be granted if an application for permit
<br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the
<br /> permittee to another person may be granted if an application for permit transfer is received before the permit
<br /> expiration date and no other changes to the permit are necessary.
<br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the
<br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas
<br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not
<br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the
<br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need
<br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in
<br /> 340-071-0160(9).
<br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when
<br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the
<br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the
<br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection
<br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection
<br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final
<br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received
<br /> before a Certificate of Satisfactory Completion can be issued.
<br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting
<br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of
<br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been
<br /> conducted within 7 days of notification of completed installation).
<br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after
<br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The
<br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,
<br /> or other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or
<br /> other material approved by the agent is completely covering all drain media where required prior to backfill.
<br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has
<br /> been issued.
<br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated
<br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt
<br /> or concrete,filling,cutting,or other soil modifications.
<br /> 1
<br /> Aidan Semmes Onsite Wastewater Specialist 1 '('/
<br /> 9/16/21:10:15:27AM ONS_OnsitePermit pr
<br />
|