My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11855980
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
11855980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 12:57:53 PM
Creation date
9/19/2023 1:56:20 PM
Metadata
Fields
Template:
Permits
Permit Address
150 SANTIAM AVE W
Permit City
Detroit
Permit Number
555-23-000232-PRMT
Parcel Number
105E02DA03800
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-23-000232-PRMT Page 2 of 3 <br /> Date Certificate Issued:09/05/2t323 i <Diu t g <br /> Work Description ALT 6DRM SFD(SEE EXPIRED PERMIT 555-20-004 4 PRMT) � <br /> sty- `�,� � .`�� J>a•+ �t g2 d'rp.. v. °,aY.� ,a �� <br /> .: .. r'�'�3F fi`#e a fig.: o nditions,of Approval .:i ` ' ir�`,�,`. .. ... W. 5" ;' e.,t ....... ......,. <br /> Pressurized distribution rules at OAR 340-071-0275.Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. Filter <br /> fabric required over drain media(rapidly permeable soils). The owner of a pressurized distribution system <br /> must maintain a contract with a certified maintenance provider to inspect,adjust and maintain the onsite <br /> system.The maintenance provider must submit an annual report and annual evaluation fee. Dry soil <br /> installation only(June 1 —October 1 unless otherwise authorized by the agent).The system must be <br /> installed by the property owner or a licensed sewage disposal business(installer).Vehicular traffic and <br /> livestock must be restricted from the system area.All roof drains must be directed away from the system All <br /> tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. Meet all required setbacks The system must be installed in <br /> the area approved during the site evaluation and in accordance with the construction plan approved by the <br /> agent, including any changes made by the agent. For product approval information and manufacturer <br /> installation requirements see DEQ website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical, or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is <br /> required for pump wiring installation.A minimum 18-gauge, green jacketed tracer wire or green <br /> color-coded metallic tape must be placed on top of the effluent sewer or pressure transport pipe from tank <br /> to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 9/5/23:4:01:06PM ONS_OnsiteCSC_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.