Laserfiche WebLink
RECEIN E, <br /> Pressure Distribution Systems-Recommended Standards.and Guidar&e SEP 13 2021 <br /> MARION COUNTY <br /> Figure 88 Mon toring/Cleanout Port(Example) <br /> 0 9 2923 <br /> THREADED CAP OR•PLUG MARION COUNTY <br /> BUILDING INSPECTION <br /> PLUG IN SLEEVE 6"PVC <br /> LAST ORIFICE;WITH <br /> ORIFICE SHIELDS IF • <br /> ORIFICE.ORIENTATION IS • <br /> BACKFILL f • UPWARD <br /> MATERIAL \ \ '\ <br /> 1��!l l ��l; r elf 6"-24 <br /> o :}'1O <br /> \\4�607; �b4Qo '— PRESSURE LATERAL <br /> , \jo0•,o0 0 0 40000 AS SPECIFIED <br /> PVC HOSE OR �� \ O D °�.a <br /> LONG SWEEP !. • !0 00 •o '•000 0 a <br /> ELBOW \ \ DRAIN ROCK;6"NUN. <br /> . \\.� \%�i BELOW PIPE <br /> UNDISTURBED SOIL <br /> 6"PVC WITH DRAIN <br /> HOLES;EXTEND TO <br /> BOTTOM OF GRAVEL TO <br /> MONITOR PONDING <br /> • INFILTRATIVE SURFACE <br /> MONITORING/CLEANOUT PORT <br /> - (EXAMPLE) <br /> • <br /> q <br />