Laserfiche WebLink
Oregon Department of Environmental Quality <br /> • Dosing tank capacity (gallons) <br /> • Tank volume determined by: Check all that apply, add comments below as needed <br /> ❑Permit Records ❑Measured E Stamped on Tank❑Other <br /> • Dosing tank material <br /> • Dosing tank appears to be watertight and in good condition EYes ENo <br /> • Dosing tank lid is intact EYes ENo <br /> • Electrical components are sealed and watertight EYes ENo <br /> • Pump/siphon is functional EYes ENo <br /> • Type of Pump ❑Demand dose ETime dose <br /> • Pump control mechanism is functional(floats,pressure transducer) EYes ENo <br /> • There is a high water alarm['Yes ENo <br /> • The high water alarm(audible and visual)is working EYes ENo ❑Not Applicable <br /> • Type of screen <br /> • Screen is clean and free of debris EYes ENo-Screen cleaned for this evaluation EYes ENo <br /> • Scum/sludge present in Dosing tank EYes ENo <br /> • Scum layer (inches) Sludge layer (inches) <br /> • Additional Comments: <br /> 5. Soil absorption system <br /> The soil absorption system is a set of trenches that receives effluent from the septic tank and <br /> filters the effluent before it enters the groundwater. <br /> • The septic system has a soil absorption system IZYes ENo EUnknown <br /> • Was the soil absorption system part of the evaluation?Eyes ENo ESee note below <br /> If the soil absorption system was not evaluated,please explain below(for example unable to <br /> locate,client did not authorize this part of the evaluation): <br /> Not a part of this assessment. <br /> • Absorption distribution EEqual ❑Serial ['Pressure ❑Equal via pressure <br /> • Absorption lines construction material: <br /> ❑ Gravel and pipe ❑ Chamber ❑Tile ❑Polystyrene foam and pipe ❑Other <br /> • Absorption distribution unit(s): ❑dropbox Ehydrosplitter Eequal distribution box <br /> ❑ Intact ❑Damaged ❑N/A <br /> • Absorption distribution unit(s)are free of debris or solids EYes ENo ❑N/A <br /> Page 4 of 8 <br />