My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11853094
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
11853094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2023 1:05:40 PM
Creation date
9/18/2023 12:14:31 PM
Metadata
Fields
Template:
Permits
Permit Address
36155 NIAGARA HTS RD SE
Permit City
Gates
Permit Number
555-23-004269-PRMT
Parcel Number
094E28CB00300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-23-004269-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555083555861 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issCied 7/20/23 s � s� � xptrattr�n dale 7119/24 <br /> Work description FIRE MAJ�REP 2 SDRM SFD s' <br /> <.. .: . �: .,v tP .lea✓;.a, t fk,�«,..,,. „s.,,.- _ .,..,, .. .,y„ ., .;<r",+.3K., r. .,,..<.. ,... w,� ,,.:.d° ...., .. ,. .._,-. -- _ .. ..,., r,a. ..,a N. <br /> Special Requirements <br /> Stake out required: Yes <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Other special rqmt: orifices drilled 1/8th inch and 24 inches apart, must have orifice caps will require operation and maintenance <br /> agreements <br /> Conditions of approval <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping <br /> with acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10% <br /> variation. <br /> •Filter fabric required over drain media (rapidly permeable soils). <br /> •The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system. The maintenance provider <br /> must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater than <br /> 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes.An electrical permit and inspection from the <br /> Department of Consumer and Business Services, Building Codes Division, or the municipality with <br /> jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent sewer. The effluent sewer must extend at least 5 feet beyond the septic tank before <br /> connecting to the distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet and <br /> at least 2 inches of fall from one end of the pipe to the other. In addition, there must be a minimum <br /> difference of 8 inches between the invert of the septic tank outlet and either the invert of the header to <br /> the distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to <br /> the distribution pipes of an equal distribution absorption field. <br /> 7/20/23:11:01:40AM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.