Septic Permit 555-23-005617-PRMT Page 2 of 3
<br /> � �r" r�w�, 7w�is�a � sa`v j'.
<br /> {)at8 G`BrtiftCate fSS 4 cJt ill r j s 4 £ YN M ��W ll
<br /> F'�r�yr .�.� �9� � r ��,1A is
<br /> W64"1::6414/ikiii MA.!RAP BDF�M° Ff Y' 5�� R kO*V if;i,*9f�
<br /> ^�Oir. I a� ash 5 , R , _y � C� a aaf �" � $'� j£ �
<br /> v.��3,,.�.., ns,��. ` s. ,,,..., re,�"�.r#, ti.�.,�k`„��.d'ra u;,.€ <__. .;. .. �.,.� ,., o.. .. ., ,,, .� w, � � �. �,...,u r.,iy. z,�.� yA,.x.,.,•.,�,..
<br /> .�- ah ,� fm h t�� '^ r
<br /> �d3 % qb /AS V i 'f P(2 GOlti tf3�ft15 C'�Ajtp rp d" g
<br /> �°°�
<br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent).
<br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer).
<br /> •Vehicular traffic and livestock must be restricted from the system area.
<br /> -All roof drains must be directed away from the system
<br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if
<br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain access to septic tank for pumping and
<br /> service.
<br /> •Meet all required setbacks
<br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan
<br /> approved by the agent,including any changes made by the agent.
<br /> •All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications without approval
<br /> by the agent.
<br /> •For product approval information and manufacturer installation requirements see DEQ website at:
<br /> http://www.oregon.govkleq/Residential/Pages/Onsite.aspx
<br /> •Install the pump and system components in accordance with the approved pump curve and specifications.
<br /> •Equal distribution,all trench bottoms must be at the same elevation. Use Distribution box(es).
<br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch.
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect
<br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance
<br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or
<br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment
<br /> of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the
<br /> issuance of this Certificate of Satisfactory Completion.
<br /> •
<br /> 8/25/23:7:49:56AM ONS_OnsiteCSC_pr
<br />
|