My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11853087
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
11853087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 1:51:29 PM
Creation date
9/18/2023 12:14:17 PM
Metadata
Fields
Template:
Permits
Permit Address
1299 ANKENY HILL RD SE
Permit City
Jefferson
Permit Number
555-23-003052-PRMT
Parcel Number
093W22A 00300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-23-003052-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555089467175 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 6/23/23 Expiration date 6/22/244 <br /> f <br /> Work description MAJ PREP 2�BDRM MH '� �� 3 � a �� <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Other special rqmt: existing water line to the East of the approved area must be removed to get final on drainfield <br /> Conditions of approval <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> •Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank <br /> before connecting to the distribution unit. It must be installed with a minimum fall of 4 inches <br /> per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In addition, <br /> there must be a minimum difference of 8 inches between the invert of the septic tank outlet <br /> and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal <br /> distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and <br /> bedded. <br /> .Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> 6/23/23:12:49:19PM ONS_OnsitePermit_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.