Laserfiche WebLink
Oregon 7 August 2 8 <br /> .. '' EZi!? id. 1"14 <br /> Under Oregon Administrative Rule(OAR)340-071-0117,(2005 by INFILTRATOR <br /> Revised OAR 340-071-0135), Infiltrator Water Technologies Installation Instructions <br /> has received approval from the Oregon Department of Envi- � � , ,,, <br /> ronmental Quality(DEQ)to install the EZflow 1201 P configura- for EZfIOW Sy$tems . /3 n' <br /> tion in the State of Oregon. The DEQ has also approved vari- ,._ <br /> ous EZflow products for use in Standard Disposal Trenches, in Oregon F ,,, ` i <�. <br /> Capping Fill Systems, Sand Filter Systems, Seepage Trench ; <br /> Systems, Steep Slope Systems, Curtain Drains,Tile Dewater- -i f / <br /> ing Systems, and Pressurized Distribution Systems. ,'' ' r ; ' . " <br /> 1= <br /> , wr' v r�{a z. z, <br /> Materials & Equipment Needed � r= 4 , <br /> • EZflow Bundles 1�,a;4,y;r �, �# ,t p} ' <br /> • EZflow barrier Paper or DEQ approved geotextile on , ,,' " "v ;! ,t,r ,„ , x`%14iV, ,� ' <br /> non-GEO products only ( ,,�fr" °` <br /> • EZflow Internal Pipe Couplers <br /> as <br /> • Pipe for Header and Inlet < -;}� r4 , ,�d w <br /> • Backhoe -,t� `'a tt,- ;.---�``' a ,,,,:, , :v r / <br /> • Laser,Transiton <br /> Installation Instructions 6. Place EZflow bundle(s)in the EZflow configuration 4t1 ' " (�/� <br /> The instructions for installation of EZflow products are given per permit.The top or center-most bundles containing pipe I3I <br /> below. EZflow products must be installed in accordance with are joined end to end with an internal pipe coupler.Any <br /> OAR Chapter 340, Divisions 071 &073, as well as the DEQ additional aggregate only bundles,should be butted against <br /> or local unit of government with jurisdiction. the other aggregate-only bundles and do not require any <br /> type of connection. <br /> 1.After the DEQ or local unit of government with jurisdiction <br /> has determined sizing,configuration, and layout for the 7. Header or lead lines from the distribution/drop box or <br /> EZflow system,stake or mark with paint the location of device will be connected to top or center-most pipe bundle <br /> trenches and lines. Set tank, invert pipe, header line or in each trench or inserted into pipe. <br /> distribution box and trench bottom elevations before <br /> installation of pipe bundles. 8.The EZflow drainfield systems should be installed in a <br /> level trench in all directions(both across and along the <br /> 2.The proper elevation of solid PVC effluent pipe going to trench bottom)and should follow the contour of the ground <br /> each trench should be determined to ensure compliance with surface elevation (uniform depth),with all continuous, <br /> the required maximum trench bottom depth as shown on the adjoining 10-foot bundles placed end to end,with central <br /> approved permit.This trench depth may vary depending on bundle distribution pipe connected. <br /> system height and configuration used. <br /> 9. EZflow bundles are flexible and can fit in curved trenches <br /> 3. Remove plastic EZflow shipping bags prior to placing as may be necessary to avoid trees, boulders, or other <br /> bundles in the trench(es). Remove any plastic bags in the obstacles. <br /> trench before system is covered. <br /> 10.Final contours and landscaping should be done in a <br /> 4.The top of each 1201 P-GEO and 1202H-GEO bundle manner to promote surface water runoff. <br /> contains a geotextile pre-inserted between the netting and <br /> aggregate.The geotextile is present to prevent soil intrusion Repeat steps 1 thru 10 for each required trench. <br /> and shall be placed facing upward. If using the 1202H-GEO, <br /> the bundles shall be placed with the geotextile on top and in As required by state or local regulations, be sure to obtain <br /> contact with the geotextile contained in the adjacent bundle proper installation inspection from the DEQ or local unit of <br /> before backfilling. government with jurisdiction prior to covering the system. <br /> 5.For EZflow products not containing GEO, only the top of After the system has been completely covered,vehicular <br /> the upper bundle should be covered with 60 lb. untreated traffic across or along the trenches shall be avoided. <br /> building paper available from EZflow.Other material such as <br /> DEQ approved geotextile may be used.A geotextile cover is <br /> necessary in sandy soils. <br /> •• . • . • A . - - ••• •• - - •• - - ■-•. O'• • .1 - . -1'11.. -A A •. <br />