Laserfiche WebLink
Onsite Permit 555-22-007556-PRMT-01 Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555085739838 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store <br /> 3 ,... q y,,*.u=" =-: -�,•,-� �¢'I rot.,a6 ," +' .9 - - -;'W.«-" =` "Is xt. <br /> Media type: Rock/Pipe Media depth: N/A <br /> Trench length: N/A Rock above pipe: 6 in. <br /> Total rock depth: 12 in. Rock below pipe: 6 in. <br /> Max depth: 24 in. Undisturbed soil between trenches: N/A <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: No <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Conditions of approval <br /> •This permit is for the installation of an Alternative Treatment Technology (ATT) system and <br /> is to be installed by a person certified by the system manufacturer in accordance with OAR <br /> 340-071-0600 and 0650. See Alternative Treatment Technology rules at OAR 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT <br /> maintenance provider is required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider <br /> certified by the manufacturer to inspect, adjust and maintain the onsite system.The <br /> maintenance provider must submit an annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in <br /> accordance with the construction plan approved by the agent, including any changes made <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ <br /> website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building, electrical, or other codes. An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral <br /> piping with acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less <br /> than 10%variation. <br /> •Filter fabric required over drain media (rapidly permeable soils). <br /> 11/3/22:9:45:55AM ONS_OnsitePermitpr <br />