Laserfiche WebLink
Onsite Permit 555-21-008417-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555003231464 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date�sSued 218122 expiration date 218/23 <br /> Work BDRM REPL 3 BDRMD <br /> A <br /> Q <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> " Stake out required: Yes <br /> Groundwater type: Permanent Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •This repair permit is for replacement of the existing septic system following the Beachie Creek Fire of 2020.A <br /> reasonable repair is granted to allow for 400 square feet of seepage bed instead of 500 square feet.The system is <br /> sized at 375 gallons per day as it is a lot of record pre-1978 and cannot accommodate a system sized for 450 <br /> gallons per day. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services,Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 2/8/22:7:55:25AM ONS_OnsitePermitpr <br />